Multiple Choice Questions (MCQs) are a great way to test how well a student understands a concept. The experts at Guru MCQs have created these Software Engineering MCQs based on current trends and practices. These MCQs, along with answers, cover all aspects of Software Engineering. They are also helpful for competitive exams like PPSC, FPSC, SPSC, KPPSC, BPSC, and others. The Software Engineering Questions and Answers include topics such as Evolutionary Software Process Models, Selection of a Life Cycle Model, Fourth Generation Techniques, Software Process and Product – 1, Software Process and Product – 2, Agile Software Development, Extreme Programming, Requirement Engineering, Functional and Non-Functional Requirements, Requirement Elicitation, Requirement Elicitation Techniques – 1, Requirement Elicitation Techniques – 2, Requirement Analysis, Requirement Documentation, Requirement Management, etc. If you’re interested, you can also find Civil Engineering Questions and Answers on the platform.

31. Which of the following is not a part of process change ?

A. Introducing new practices, methods or processes
B. Introducing new team members to existing project
C. Introducing or removing deliverable
D. Introducing new roles or responsibilities

32. It is always best to start process analysis with a new test model ?

A. True
B. False

33. The CMMI assessment is based on a x-point scale. What is the value of x ?

A. 0
B. 2
C. 4
D. 6

34. Which of the following is not a SQA plan for a project ?

A. evaluations to be performed
B. amount of technical work
C. audits and reviews to be performed
D. documents to be produced by the SQA group

35. ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?

A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned

36. Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?

A. CMM
B. ISO 9001
C. ISO 9000-3
D. None of the mentioned

37. Which of the following is not a maturity level in CMM ?

A. Design
B. Repeatable
C. Managed
D. Optimizing

38. CO policy in CMM means___________________?

A. The leadership practices in Commitment to Perform
B. The organizational structure (groups) practices in Ability to Perform
C. The policy practices in Commitment to Perform
D. The planning practices in Commitment to Perform

39. The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?

A. True
B. False

40. What is not included in prevention costs ?

A. quality planning
B. formal technical reviews
C. test equipment
D. equipment calibration and maintenance